Skip to main content

This website uses cookies and similar technologies. By using our website, closing this banner or clicking "I agree", you consent to our use of cookies. For additional details, please read our privacy policy.

I AGREE

SFCTA

Main navigation

  • Projects & Studies
    • Featured
    • Active
    • Capital Projects
    • Neighborhood Transportation Planning
    • Long-Range Planning
    • Congestion Management
    • All
  • Funding
    • Half-cent Sales Tax for Transportation
    • Prop AA Vehicle Registration Fee
    • Lifeline Transportation Program
    • One Bay Area Grant Program
    • Transportation Fund for Clean Air
    • TNC Tax
    • Funding Opportunities
  • Policies & Initiatives
    • Autonomous Vehicle (AV) Technology
    • Climate Action
    • Closing the Funding Gap
    • Complete Streets
    • Emerging Mobility
    • Equity Priority Communities
    • Neighborhood Program
    • Pricing & Incentives
    • Transit-First Policy
    • Transportation Demand Management
    • Vision Zero
  • Tools & Data
    • Maps & Data
    • Transportation Analysis Tools
  • What's Happening
    • Meetings, Agendas & Events
    • Blog
    • Press Releases
    • Stay Connected
  • About Us
    • Who We Are
    • Work with Us
    • Annual Reports
    • Governing Policies
    • Contact Us

Projects & Studies

We plan, fund, and deliver projects large and small across the city.

Select category

Grid List
Image
A view of Cow Palace from the Geneva Ave/Schwerin intersection

Geneva-Harney Bus Rapid Transit Feasibility Study

The Geneva-Harney Bus Rapid Transit line is a proposed rapid transit service that will provide existing and future neighborhoods along the San Mateo-San Francisco County border with a rapid bus connection to regional transit service.
Image
Geary Bus Rapid

Geary Bus Rapid Transit

Geary Bus Rapid Transit will improve Geary Boulevard with much-needed safety improvements and faster, more reliable bus service for the tens of thousands of people who use the 38 Geary and 38R Geary Rapid bus routes every day. Project improvements include red bus-only lanes, signal priority for buses, and safety improvements such as sidewalk extensions and accessible curb ramps.
Image
Photo of Van Ness bus in bus-only lane at a station

Van Ness Improvement Project

The Van Ness Improvement Project is bringing San Francisco its first Bus Rapid Transit system.
Image
Bayview Hunters Point Photo credit SFMTA

District 10 15 Third Street Bus Study

The District 10 15 Third Street Bus Study evaluated re-establishing the 15 Third Street Muni bus route. Residents and community members in Dogpatch, Bayview, and Hunter’s Point have raised concerns about delays and reliability of T Third light rail service on Third Street and expressed a desire to return bus service to the corridor. SFMTA is currently operating a new 15 Third Express route as identified by this study.
Image
The intersection of 38th and Geary, viewed from street level.

38th and Geary Rectangular Rapid Flashing Beacons

This project will design and install rectangular rapid flashing beacons, pedestrian push buttons, and improved signage to improve pedestrian safety at the intersection of 38th Avenue and Geary Boulevard.
Image
A view of the Salesforce Transit Center, a red transit-only lane, and a bus

Salesforce Transit Center

The Salesforce Transit Center is San Francisco’s regional transit hub.
Image
Kids crossing the street with a crossing guard at 20th and Connecticut streets

Potrero Hill Pedestrian Safety and Transit Stop Improvements

This SFMTA- led project includes roadway and public space improvements to enhance pedestrian safety, improve access to transit stops, reduce both intersection crossing distances and traffic speeds, and provide new community gathering areas. 
Image
People standing on a sidewalk with phones and a ride-hail vehicle dropping someone off

Emerging Mobility Evaluation Report

This report provides the first comprehensive look at the rapidly evolving emerging mobility sector in San Francisco.
Image
An aerial view of the project street

Elk Street at Sussex Street Pedestrian Safety Improvements

Pedestrian safety improvements at the intersection may include up to three bulb-outs, rectangular rapid flashing beacons, and pedestrian crossing signage to improve safety and access to Glen Canyon Park. 
Image
Rendered image of an island with buildings and a port in the nearby lagoon. There is a ferry pulling up to a dock in the foreground.

Treasure Island Transportation Program

The Treasure Island Transportation Program will address the island's growing transportation needs with a goal to have at least 50 percent of trips made by transit instead of private vehicles.
Image
Cars headed toward San Francisco on the freeway

San Francisco Freeway Network Management Study

The study will consider managed lane alternatives, including priced lane and priced facility options, for freeways within San Francisco (Central Freeway, I-80, U.S. 101, I-280) with the goals of reducing vehicle miles traveled, increasing person throughput, and improving transit reliability.
Image
An image of the 66-Quintara bus

66-Quintara Reconfiguration Study

The 66-Quintara Reconfiguration Study identified ways to meet the San Francisco West Side neighborhoods’ transit access and connectivity needs.
Image
People walking on Clement past Green Apple bookstore

District 1 Multimodal Transportation Study

The District 1 Multimodal Transportation Study will engage the community to identify known mobility challenges and develop near- to long-term strategies to improve transit reliability and safety and shift trips to transit, walking, biking, or other non-driving options.
Image
Rendering of Treasure Island showing housing and office buildings

Treasure Island Supplemental Transportation Study

The study goal is to understand resident and worker transportation needs, outline recommended short-term public transit improvements, and plan for supplemental transportation options.
Image
Taxis, an Uber, other cars, and people walking in congested downtown San Francisco

Downtown Congestion Pricing

Congestion pricing would involve charging drivers a fee to drive in specific congested areas of downtown to keep traffic and transit moving.

Pagination

  • Current page 1
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Next page Next page
[site.name]

Social media links

  • Follow us on Facebook Follow us on Facebook
  • Follow us on Instagram Follow us on Instagram
  • Follow us on LinkedIn Follow us on LinkedIn
  • Follow us on Twitter Follow us on Twitter
  • Follow us on YouTube Follow us on YouTube

Stay Connected

Sign up for our monthly email newsletter The Messenger, and get project-specific updates.

Sign Up

Contact

info@sfcta.org
415-522-4800

1455 Market Street, 22nd Floor
San Francisco, CA 94103
United States

View our privacy policy, sweepstakes rules, and terms and conditions.

carrot-left carrot-down arrow-right close menu download carrot-right search logo facebook twitter linkedin youtube instagram carrot-left pdf video zip