Project Lists for all 5-Year Prioritization Programs (5YPPs)

View Project Lists for all 5YPPs (Google Sheet) (Current)

Project lists provide up to date programming and allocations for each 5YPP. Click on the above link for access to downloadable spreadsheets for all programmatic categories.

Full 5-Year Prioritization Program Documents

5YPP documents include descriptions of project and sponsor eligibility for category funds, prioritization criteria, project delivery from previous funding cycles, and information on projects programmed in the 2019 5YPP cycle. In December 2021, several 5YPPs were revised as part of the 2021 Prop K Strategic Plan Update. For each 5YPP that was revised, we have provided an updated program of projects and project information forms for newly added projects. For the most up-to-date Prop K programming information, please refer to the Google Sheet link, "View Project Lists of All 5YPPs" above.

BRT/TPS/Muni Metro Network (EP 1)

Implement Bus Rapid Transit and Transit Preferential Streets programs to create an integrated citywide network of fast, reliable bus and surface light rail transit services connecting to services provided by MUNI rail and historic streetcar lines, BART and Caltrain.

EP 1 - Comprehensive 5YPP update, December 7, 2021 (PDF)
EP 1 5YPP (PDF)

Caltrain Capital Improvement Program (EP 7)

Provides San Francisco's local match contribution for Caltrain's Capital Improvement Program (CIP) projects, including continued implementation of express tracks between San Francisco and San Jose to improve travel time and reliability.

EP 7 5YPP (PDF)

BART Station Access, Safety, Capacity (EP 8)

Improvements to stations and other facilities owned or operated by BART within San Francisco to enhance passenger safety, accessibility and capacity, improved signage and security, realtime traveler information, intermodal access improvements, and street level plaza improvements.

EP 8 - Comprehensive 5YPP update, December 7, 2021 (PDF)
EP 8 5YPP (PDF)

Ferry (EP 9)

Improvements to downtown ferry terminals to accommodate increases in ferry ridership, including: additional intermodal connections, new ferry berths, improved emergency response systems, landside improvements, and rehabilitation of passenger-serving facilities.

EP 9 5YPP (PDF)

Transit Enhancements (EP 10–16)

Programmatic improvements that promote system connectivity and accessibility, close service gaps, and improve and expand transit service levels.

EP 16 - Comprehensive 5YPP update, December 7, 2021 (PDF)
EP 10-16 5YPP (PDF)

Vehicles (EP 17)

Programmatic improvements for the upgrade, rehabilitation and replacement of transit vehicles, spare parts and on-board equipment.

EP 17M - Comprehensive 5YPP update, December 7, 2021 (PDF)
EP 17M 5YPP (Muni)/ EP 17U (Undesignated) 5YPP (PDF)
EP 17P 5YPP (PCJPB/Caltrain) (PDF)

Facilities (EP 20)

Programmatic improvements for the upgrade, rehabilitation and replacement of transit facilities and facilities-related equipment.

EP 20M - Comprehensive 5YPP update, December 7, 2021 (PDF)
EP 20B 5YPP (BART) (PDF)
EP 20M 5YPP (Muni) (PDF)
EP 20P 5YPP (PCJPB/Caltrain) (PDF)

Guideways (EP 22)

Rehabilitation, upgrades and/or replacement of rail, overhead trolley wires, signals, and automatic train control systems. The intent is to implement TPS standards whenever rehabilitation, upgrade or replacement projects of light rail lines are undertaken. Seismic retrofit and improvements to emergency lighting and ventilation.

EP 22B - Comprehensive 5YPP update, December 7, 2021 (PDF)
EP 22M - Comprehensive 5YPP update, December 7, 2021 (PDF)
EP 22B 5YPP (BART) (PDF)
EP 22M 5YPP (Muni) (PDF)
EP 22P 5YPP (PCJPB/Caltrain) (PDF)

New and Upgraded Streets (EP 26–30)

Upgrading and extending streets and other vehicular facilities to bring them up to current standards, including the addition of Transit Preferential Streets treatments to transit corridors and construction of major bicycle and pedestrian facilities.

EP 27 - Comprehensive 5YPP update, December 7, 2021 (PDF)
EP 26–30 5YPP (PDF)

New Signals and Signs (EP 31)

Programmatic improvements including new traffic signs and signals (including pedestrian and bicycle signals) implementation of transit priority systems on select corridors, and new pavement markings.

EP 31 - Comprehensive 5YPP update, December 7, 2021 (PDF)
EP 31 5YPP (PDF)

SFgo: Advanced Tech and Info Systems (EP 32)

Programmatic improvements using advanced technology and information systems to better manage roadway operations for transit, traffic, cyclists, and pedestrians.

EP 32 5YPP (PDF)

Signals and Signs Maintenance and Renovation (EP 33)

Programmatic improvements including maintenance and upgrade of traffic signs and signals, including new mast arms, LED signals, conduits, wiring, pedestrian signals, left turn signals, transit pre-empts, and bicycle route signs and signals.

EP 33 - Comprehensive 5YPP update, December 7, 2021 (PDF)
EP 33 5YPP (PDF)

Street Resurfacing, Rehab and Maintenance (EP 34–35)

Repaving and reconstruction of city streets to prevent deterioration of the roadway system, based on an industry-standard pavement management system designed to inform cost effective roadway maintenance. Replacement of street repair and cleaning equipment according to industry-standards.

EP 34 - Comprehensive 5YPP update, December 7, 2021 (PDF)
EP 34–35 5YPP (PDF)

Pedestrian and Bicycle Facility Maintenance (EP 37)

Public sidewalk repair and reconstruction citywide. Additional pedestrian facility improvements including stairways, retaining walls, guardrails and rockfall barriers. Upgrades of substandard bicycle lanes; rehabilitation of bicycle paths, and reconstruction of Muni passenger boarding islands.

EP 37 5YPP (PDF)

Traffic Calming (EP 38)

Programmatic improvements to neighborhood streets to make them more livable and safe to use for all users - pedestrians, cyclists, transit, and autos. Includes strategies to reduce auto traffic speeds and improve pedestrian and bicyclist safety and circulation.

EP 38 5YPP (PDF)

Bicycle Circulation/Safety (EP 39)

Programmatic improvements to the transportation system to enhance its usability and safety for bicycles. Infrastructure improvements on the citywide bicycle network. Support for bicycle outreach and education programs.

EP 39 5YPP (PDF)

Pedestrian Circulation/Safety (EP 40)

Programmatic improvements to the safety and usability of city streets for pedestrians.

EP 40 5YPP (PDF)

Curb Ramps (EP 41)

Construction of new wheelchair curb ramps and related roadway work to permit ease of movement for the mobility impaired. Reconstruction of existing ramps.

EP 41 5YPP (PDF)

Tree Planting and Maintenance (EP 42)

Planting of new street trees and maintenance of new and existing trees in public rights-of-way throughout the City.

EP 42 5YPP (PDF)

Transportation Demand/Parking Management (EP 43)

Develop and support continued Transportation Demand Management (TDM) and parking requirements for downtown buildings, special event sites, and schools and universities. Includes studies and projects that can lead to reduction of single-occupant vehicle dependence and improve access of disadvantaged populations to jobs and key services.

EP 43 5YPP (PDF)

Transportation/Land Use Coordination (EP 44)

Transportation studies and planning to support transit oriented development (TOD) and neighborhood transportation planning. Local match for San Francisco and regional grant programs that support TOD and fund related improvements for transit, bicyclists, and pedestrians, including streetscape beautification improvements.

EP 44 5YPP (PDF)